Asbestos abatement before renovation and demolition in La Mesa

Typical cost in La Mesa

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
  • Whole-house survey before a remodel or demolition$600 – $1,500+

Asbestos the work will disturb has to come out before a demolition or a remodel starts, whether the job is one bathroom or a whole-house teardown. A survey lists every material the plans will disturb, and the demolition rules in San Diego County depend on the building type. We read your plans, arrange the right survey and take out what has to go before the builder starts.

Asbestos usually comes up once the drawings exist and a permit is close, and that is the right time to sample. Most of our work is in La Mesa, and we plan jobs the same way in Lemon Grove and Santee.

Request a free quote
Older house prepared for demolition with fencing and containment and no workers present

Asbestos abatement before renovation and demolition options

Kitchen and bath remodels with several materials

A single bathroom can hold floor tile and mastic, a mortar bed, wall texture, joint compound, a popcorn ceiling and wrapped pipe in the wall. Test one suspect material and assume the rest is fine, and the remodel can stall halfway. Our survey lists every layer the demolition will touch, and the removal plan follows it.

Teardowns and load-bearing demolition

In buildings covered by the air district rule, a demolition needs a notice whether or not any asbestos is found. The air district describes demolition as wrecking a load-bearing structure. Asbestos that would be broken up has to come out first. The City of La Mesa Building Division can tell you whether it wants the survey before it issues a demolition or building permit.

Phased work and occupied homes

Some owners remodel in stages and live in the house meanwhile. Each phase gets its own containment, and if the survey did not cover a later phase, we do more sampling before that wall or floor is opened. In covered buildings, an air district notice lasts 365 days and has to be revised once the amount of asbestos grows by 20% or more.

Materials found after work begins

Sometimes a demolition crew uncovers a material nobody sampled, such as old pipe wrap behind a wall or a second floor under the plywood. Work in that area stops, we sample the material, and removal is planned before demolition resumes. In a covered building, asbestos that turns up unexpectedly mid-job can count as an emergency renovation, and so can fire, water or earthquake damage. The notice is then due by the end of the next working day.

Match the survey to the plans

We draw the survey from your plans: every wall, ceiling, floor and system the work will remove or cut, sampled layer by layer, with a map of where each sample came from. In a covered building the surveyor also needs a current EPA-approved building inspector certificate, and the survey is required whatever the building’s age.

California adds its own rule. For a removal of 100 square feet or more, only a Cal/OSHA-certified asbestos consultant, or a technician working under one, can do the survey. If the plans change, the survey has to change with them, so send us revised drawings before anyone cuts.

Only one material involved? Window and door openings, for example, are covered under asbestos stucco removal. Our other work is on the homepage.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (619) 639-0343

Call (619) 639-0343