Size the wall work before it starts
Square footage is what triggers each rule, so measure it before deciding anything. Rule 1206 exempts renovations disturbing less than 100 square feet of building materials in any 365-day period, and residential buildings of four or fewer units are exempt regardless of size. Cal/OSHA requires DOSH registration for work involving 100 square feet or more of material over 0.1% asbestos.
CSLB uses the same 100-square-foot line: a contractor doing that much asbestos work needs the C-22 classification or a qualifier who passed the asbestos certification exam. If your remodeler holds neither, they can subcontract the abatement. Ask to see the licence and DOSH registration before walls are opened.
A wall that comes out can leave a scar in the ceiling and floor beside it. For those surfaces, read asbestos popcorn ceiling removal and asbestos floor tile and mastic removal; La Mesa Asbestos Removal lists everything else we take on.