Protecting yards, neighbors and the open wall
Exterior work happens in the open air, so we seal off the work area with plastic on the ground and along the wall, cover gutters and vents, and close nearby windows. La Mesa’s dry inland weather carries dust farther and dries debris out faster, so keeping the stucco damp and bagging it as it comes off matters more here than on a mild, humid coast.
Broken stucco that crumbles is friable waste, and friable waste with 1% or more asbestos is hazardous waste that needs a licensed hauler. Before framers or plasterers go back to the wall, we clean and inspect the area, so the next crew starts on a clear wall.
An addition or a run of new windows often disturbs interior finishes too. For that, see asbestos abatement before renovation and demolition. We also take on ceilings, floors, ducts and walls, all listed on the homepage.