Records owners and managers should keep
A complete abatement file protects the owner the next time the building is sold, refinanced or remodeled. It should hold the facility survey with the surveyor’s EPA building inspector certificate number and the laboratory reports, the APCD notification and any revisions (a revision is required if the asbestos quantity grows by 20% or more), and the contractor’s DOSH job notice.
It should also include the waste shipment records signed at the disposal site, the consultant’s clearance or air sampling results where a certified asbestos consultant or site surveillance technician monitored the work, and the CSLB licence and DOSH registration of the abatement contractor. Keep the survey on site for the duration of the job.
When a tenant improvement turns into structural work or a full gut, the planning steps on asbestos abatement before renovation and demolition apply. Single-family owners will find their services on the La Mesa Asbestos Removal homepage.